| Extra macadam driveway
(during construction only) |
$22.00 / sq yd |
| Concrete slab, no
footers |
$5.50 / sq ft |
| Extra sidewalk |
$6.00 / sq ft |
| Concrete slab with
footers, up to 4 courses of block |
$12.00 / sq ft |
| 9 ft concrete basement
wall, 10" thick |
$200 + $15.00 / lin ft |
| Insulate slab under
Family Room |
|
|
1" foam |
$0.75 / sq ft |
|
Plastic vapor barier |
$0.45 / sq ft |
| 2 coat finish on exposed
exterior concrete foundation (<4 ft) |
$650 |
| Crawl space area to full
basement |
$1500 |
| Full basement under
Family Room where slab is standard |
$3550 |
| Bilco door |
$1675 |
| Bilco door with steel
door at bottom of stairs |
$2050 |
|
|
| HEATING
OPTIONS |
|