Steve Werley - Your House Hunter
Buying A Home
Selling A Home
Building A New Home
Area Information
Relocation Information
Meet Steve
Even The Best Homes Don't Sell
Second Home / Vacation Property
Fellow Realtors
Privacy Statement
Consumer Notice
My Newsletter
Area Neighborhoods
Fellow Outdoorsmen
Clients


Terms

N


Nail inspection- An inspection made by a municipal building inspector after the drywall material is hung with nails and screws (and before taping).

Natural finish- A transparent finish which does not seriously alter the original color or grain of the natural wood. Natural finishes are usually provided by sealers, oils, varnishes, water repellent preservatives, and other similar materials.

NEC (National Electrical Code)- A set of rules governing safe wiring methods. Local codes—which are backed by law—may differ from the NEC in some ways.

Neutral wire- Usually color-coded white, this carries electricity from an outlet back to the service panel. Also see hot wire and ground.

Newel post- The large starting post to which the end of a stair guard railing or balustrade is fastened.

Nonbearing wall- A wall supporting no load other than its own weight.

Nosing- The projecting edge of a molding or drip or the front edge of a stair tread.

Notch- A crosswise groove at the end of a board.

Note- A formal document showing the existence of a debt and stating the terms of repayment.

Nozzle- The part of a heating system that sprays the fuel of fuel-air mixture into the combustion chamber.

 

A B C D E F G H I J K L M N O P Q R S T U V W Y Z

Some information courtesy of www.HomeBuildingManual.com

 

   
 
© Copyright 2002-2008
All Rights Reserved
steve@yourhousehunter.com

Prudential Landis HomeSale Services
2607 Keiser Blvd
Wyomissing, PA 19610
610-372-3200
PA license # RS-147389-A