Terms
P
Padding-
A material installed under carpet to add foot comfort, isolate sound,
and to prolong carpet life.
Pad out, pack out- To
shim out or add strips of wood to a wall or ceiling in order that the
finished ceiling/wall will appear correct.
Paint- A combination
of pigments with suitable thinners or oils to provide decorative and
protective coatings. Can be oil based or latex water based.
Pallets- Wooden
platforms used for storing and shipping material. Forklifts and hand
trucks are used to move these wooden platforms around.
Panel- A thin flat
piece of wood, plywood, or similar material, framed by stiles and rails
as in a door (or cabinet door), or fitted into grooves of thicker
material with molded edges for decorative wall treatment.
Paper, building- A
general term for papers, felts, and similar sheet materials used in
buildings without reference to their properties or uses. Generally comes
in long rolls.
Parapet- A wall
placed at the edge of a roof to prevent people from falling off.
Parting stop or strip-
A small wood piece used in the side and head jambs of double hung
windows to separate the upper sash from the lower sash.
Particle board-
Plywood substitute made of course sawdust that is mixed with resin and
pressed into sheets. Used for closet shelving, floor underlayment, stair
treads, etc.
Partition- A wall
that subdivides spaces within any story of a building or room.
Paver, paving-
Materials—commonly masonry—laid down to make a firm, even surface.
Payment schedule- A
pre-agreed upon schedule of payments to a contractor usually based upon
the amount of work completed. Such a schedule may include a deposit
prior to the start of work. There may also be a temporary 'retainer'
(5-10% of the total cost of the job) at the end of the contract for
correcting any small items which have not been completed or repaired.
Pedestal- A metal box
installed at various locations along utility easements that contain
electrical, telephone, or cable television switches and connections.
Penalty clause - A
provision in a contract that provides for a reduction in the amount
otherwise payable under a contract to a contractor as a penalty for
failure to meet deadlines or for failure of the project to meet contract
specifications.
Penny- As applied to
nails, it originally indicated the price per hundred. The term now
series as a measure of nail length and is abbreviated by the letter
"d". Normally, 16d (16 "penny") nails are
used for framing
Percolation test or perc.
test- Tests that a soil engineer performs on earth to determine the
feasibility of installing a leech field type sewer system on a lot. A
test to determine if the soil on a proposed building lot is capable of
absorbing the liquid affluent from a septic system.
Performance bond- An
amount of money (usually 10% of the total price of a job) that a
contractor must put on deposit with a governmental agency as an
insurance policy that guarantees the contractors' proper and timely
completion of a project or job.
Perimeter drain-
3" or 4" perforated plastic pipe that goes around the
perimeter (either inside or outside) of a foundation wall (before
backfill) and collects and diverts ground water away from the
foundation. Generally, it is "daylighted" into a sump pit
inside the home, and a sump pump is sometimes inserted into the pit to
discharge any accumulation of water.
Permeability- A
measure of the ease with which water penetrates a material.
Permit - A
governmental municipal authorization to perform a building process as
in:
· Zoning\Use permit -
Authorization to use a property for a specific use e.g. a garage, a
single family residence etc.
· Demolition permit -
Authorization to tear down and remove an existing structure.
· Grading permit -
Authorization to change the contour of the land.
· Septic permit - A health
department authorization to build or modify a septic system.
· Building permit -
Authorization to build or modify a structure.
· Electrical permit - A
separate permit required for most electrical work.
· Plumbing permit - A
separate permit required for new plumbing and larger modifications of
existing plumbing systems.
Pigtails, electrical-
The electric cord that the electrician provides and installs on an
appliance such as a garbage disposal, dishwasher, or range hood.
Pier- A column of
masonry, usually rectangular in horizontal cross section, used to
support other structural members. Also see Caisson.
Pigment- A powdered
solid used in paint or enamel to give it a color.
Pilot hole- A
small-diameter, pre-drilled hole that guides a nail or screw.
Pilot light- A small,
continuous flame (in a hot water heater, boiler, or furnace) that
ignites gas or oil burners when needed.
Pitch- The incline
slope of a roof or the ratio of the total rise to the total width of a
house, i.e., a 6-foot rise and 24-foot width is a one-fourth pitch roof.
Roof slope is expressed in the inches of rise, per foot of horizontal
run.
PITI - Principal,
interest, taxes and insurance (the four major components of monthly
housing payments).
Plan view- Drawing of
a structure with the view from overhead, looking down.
Plate- Normally
a 2 X 4 or 2 X 6 that lays horizontally within a framed structure, such
as:
Plan view- Drawing of
a structure with the view from overhead, looking down.
Plenum- The main
hot-air supply duct leading from a furnace.
Plot plan- An
overhead view plan that shows the location of the home on the lot.
Includes all easements, property lines, set backs, and legal
descriptions of the home. Provided by the surveyor.
Plough, plow- To cut
a lengthwise groove in a board or plank. An exterior handrail normally
has a ploughed groove for hand gripping purposes
Plumb- Exactly
vertical and perpendicular.
Plumb bob- A lead
weight attached to a string. It is the tool used in determining plumb.
Plumbing boots- Metal
saddles used to strengthen a bearing wall/vertical stud(s) where a
plumbing drain line has been cut through and installed.
Plumbing ground- The
plumbing drain and waste lines that are installed beneath a basement
floor.
Plumbing jacks-
Sleeves that fit around drain and waste vent pipes at, and are nailed
to, the roof sheeting.
Plumbing rough- Work
performed by the plumbing contractor after the Rough Heat is installed.
This work includes installing all plastic ABS drain and waste lines,
copper water lines, bath tubs, shower pans, and gas piping to furnaces
and fireplaces. Lead solder should not be used on copper piping.
Plumbing stack- A
plumbing vent pipe that penetrates the roof.
Plumbing trim- Work
performed by the plumbing contractor to get the home ready for a final
plumbing inspection. Includes installing all toilets (water closets),
hot water heaters, sinks, connecting all gas pipe to appliances,
disposal, dishwasher, and all plumbing items.
Plumbing waste line-
Plastic pipe used to collect and drain sewage waste.
Ply- A term to denote
the number of layers of roofing felt, veneer in plywood, or layers in
built-up materials, in any finished piece of such material.
Plywood- A panel
(normally 4' X 8') of wood made of three or more layers of veneer,
compressed and joined with glue, and usually laid with the grain of
adjoining plies at right angles to give the sheet strength.
Point load- A point
where a bearing/structural weight is concentrated and transferred to the
foundation.
Portland cement-
Cement made by heating clay and crushed limestone into a brick and then
grinding to a pulverized powder state.
Post- A vertical
framing member usually designed to carry a beam. Often a 4" x
4", a 6" x 6", or a metal pipe with a flat plate on top
and bottom.
Post-and-beam- A
basic building method that uses just a few hefty posts and beams to
support an entire structure. Contrasts with stud framing.
Power vent- A vent
that includes a fan to speed up air flow. Often installed on
roofs.
Premium- Amount
payable on a loan.
Preservative-. Any
pesticide substance that, for a reasonable length of time, will prevent
the action of wood-destroying fungi, insect borers, and similar
destructive agents when the wood has been properly coated or impregnated
with it. Normally an arsenic derivative. Chromated Copper Arsenate (CCA)
is an example.
Pressure Relief Valve (PRV)-
A device mounted on a hot water heater or boiler which is designed to
release any high steam pressure in the tank to prevent tank explosions.
Pressure-treated wood-
Lumber that has been saturated with a preservative.
Primer- The first,
base coat of paint when a paint job consists of two or more coats. A
first coating formulated to seal raw surfaces and holding succeeding
finish coats.
Principal- The
original amount of the loan, the capital.
Probe- The first step
in determining the suitability of a septic system. A trench is dug in
order for an engineer to inspect the depth of the soil types. This depth
will determine the type of system required ie, Sandmound or Standard
Trench.
Property survey- A
survey to determine the boundaries of your property. The cost depends on
the complexity of the survey.
P trap- Curved,
"U" section of drain pipe that holds a water seal to
prevent sewer gasses from entering the home through a fixtures water
drain.
Pump mix- Special
concrete that will be used in a concrete pump. Generally, the mix has
smaller rock aggregate than regular mix.
Punch list- A list of
discrepancies that need to be corrected by the contractor.
Punch out- To inspect
and make a discrepancy list.
Putty- A type of
dough used in sealing glass in the sash, filling small holes and
crevices in wood, and for similar purposes.
PVC or CPVC - Poly
Vinyl Chloride-A type of white or light gray plastic pipe sometimes used
for water supply lines and waste pipe.
Some information courtesy
of www.HomeBuildingManual.com